You choose the goals, boundaries, priorities, and acceptance criteria. Your assistant checks facts, keeps progress current, and makes the next step clear. You can also use the entire workspace manually.
This template does not include an AI connection or built-in automation. Reading, writing, identity checks, and scheduling depend on your chosen assistant, its capabilities, and the permissions you grant.
Leave a message → the assistant reads it manually or on a separately configured schedule → it verifies the requester and new information → it asks for missing details in the same message → it works within the approved scope → it adds the result, evidence, and gaps → you review → the result is accepted or revised.
The fictional weekly-review example shows a clarification and draft delivery. Its Ready for review status deliberately stops before acceptance.
Goal:
Available information:
Allowed actions:
Out of scope:
Ask me before:
Deliverable:
Acceptance criteria:
Preferred completion time and time zone, if any:
| Database | Status | Use it when |
|---|---|---|
| Message board | New | A genuine new request has not started. |
| Message board | In progress | Authorized work has actually started. |
| Message board | Needs input | More information or approval is required. |
| Message board | Ready for review | A deliverable and evidence are available for review. |
| Message board | Done | The agreed acceptance condition has been met. |
| Tasks | Draft / Ready to hand off | Work is not started / scope and acceptance criteria are ready. |
| Tasks | In progress / Needs input / Ready for review | Work has started / awaits input / awaits review. |
| Tasks | Blocked / Paused | Work cannot proceed / has been deliberately deferred. Record the reason. |
| Tasks | Done / Cancelled | Accepted with evidence / explicitly no longer needed. |
| Focus | Not started / In progress / Paused / Finished | The lifecycle of a whole topic or project, not one task. |
Statuses and views are not access controls. Paused does not stop an external process. Ready to hand off does not launch an assistant. A completed task does not automatically finish its parent project.
The information card is a flexible place for stocks, social updates, important emails, or other topics. BTC and SUI are only possible examples; you do not need to follow cryptocurrencies.
Choose the source, the information to retain, the acceptable age of the data, the check frequency, and the notification rules. For each real update, record its source, information time, last checked time, and any gap. An unsuccessful check must not be presented as “no updates” or as a zero value.